10 MWe solar thermal central receiver pilot plant. Solar facilities design integration: site plot plan (RADL item 7-2). [Engineering drawings]
Technical Report
·
OSTI ID:5837425
The geographic location and general layout of the Barstow Solar Pilot Plant are shown. (LEW)
- Research Organization:
- McDonnell Douglas Corp., Huntington Beach, CA (USA); Stearns-Roger Engineering Co., Denver, CO (USA)
- DOE Contract Number:
- AC03-79SF10499
- OSTI ID:
- 5837425
- Report Number(s):
- DOE/SF/10499-T51; ON: DE81029790
- Country of Publication:
- United States
- Language:
- English
Similar Records
10 MWe solar thermal central receiver pilot plant. Solar facilities design integration: site plot plan (RADL item 7-2). [Engineering drawings]
10 MWe solar thermal central receiver pilot plant. Solar facilities design integration: general arrangement plans (RADL item 7-3). [Engineering drawings]
Heliostat washing equipment requirements (RADL Item 7-17). 10-MWe solar-thermal central-receiver pilot plant: solar facilities design integration
Technical Report
·
Sat Sep 01 00:00:00 EDT 1979
·
OSTI ID:6050920
10 MWe solar thermal central receiver pilot plant. Solar facilities design integration: general arrangement plans (RADL item 7-3). [Engineering drawings]
Technical Report
·
Sat Sep 01 00:00:00 EDT 1979
·
OSTI ID:6239435
Heliostat washing equipment requirements (RADL Item 7-17). 10-MWe solar-thermal central-receiver pilot plant: solar facilities design integration
Technical Report
·
Wed Sep 01 00:00:00 EDT 1982
·
OSTI ID:6667865