Optimization of left-turn phase sequence in signalized networks using MAXBAND 86. Volume 3. Program manual. Final report, August 1084-January 1986
Technical Report
·
OSTI ID:5820643
MAXBAND has been enhanced to provide the capability of computing traffic-signal timing plans for general grid networks, using bandwidth as a criterion. The revised program is more user-friendly and has several new features. General grid networks as large as 20 x 20 can be solved. Phase-sequence optimization is provided together with NEMA, eight-phase numbering. MAXBAND is written in FORTRAN 77. Volume 3, MAXBAND Programmer's Manual, gives detailed descriptions of the subroutines composing the MAXBAND program as developed using structured programming technology. Each description includes the purpose and function of the subroutine, how it is related to other subroutines, and the variables which it uses. Other than features that have been altered, no attempt is made to document the MPCODE Mathematical Programming System, portions of which are included in the MAXBAND program.
- Research Organization:
- Texas A and M Univ., College Station (USA). Texas Transportation Inst.
- OSTI ID:
- 5820643
- Report Number(s):
- PB-87-229373/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Optimization of left-turn phase sequence in signalized networks using MASBAND 86. Volume 1. Summary report. Final report, August 1984-January 1986
Optimization of left-turn phase sequence in signalized networks using MAXBAND 86. Volume 2. User's manual. Final report, August 1984-January 1986
MAXBAND Version 3.1: Heuristic and optimal approach for setting the left turn phase sequences in signalized networks
Technical Report
·
Sat Aug 01 00:00:00 EDT 1987
·
OSTI ID:6043194
Optimization of left-turn phase sequence in signalized networks using MAXBAND 86. Volume 2. User's manual. Final report, August 1984-January 1986
Technical Report
·
Sat Aug 01 00:00:00 EDT 1987
·
OSTI ID:5832713
MAXBAND Version 3.1: Heuristic and optimal approach for setting the left turn phase sequences in signalized networks
Technical Report
·
Tue Jan 31 23:00:00 EST 1995
·
OSTI ID:34378
Related Subjects
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION
320200* -- Energy Conservation
Consumption
& Utilization-- Transportation
99 GENERAL AND MISCELLANEOUS
990220 -- Computers
Computerized Models
& Computer Programs-- (1987-1989)
COMPUTER CODES
COMPUTERIZED CONTROL SYSTEMS
CONTROL
CONTROL SYSTEMS
DOCUMENT TYPES
FORTRAN
LAND TRANSPORT
MANUALS
NETWORK ANALYSIS
OPTIMIZATION
PROGRAMMING
PROGRAMMING LANGUAGES
ROAD TRANSPORT
SIGNALS
TRAFFIC CONTROL
TRANSPORT
320200* -- Energy Conservation
Consumption
& Utilization-- Transportation
99 GENERAL AND MISCELLANEOUS
990220 -- Computers
Computerized Models
& Computer Programs-- (1987-1989)
COMPUTER CODES
COMPUTERIZED CONTROL SYSTEMS
CONTROL
CONTROL SYSTEMS
DOCUMENT TYPES
FORTRAN
LAND TRANSPORT
MANUALS
NETWORK ANALYSIS
OPTIMIZATION
PROGRAMMING
PROGRAMMING LANGUAGES
ROAD TRANSPORT
SIGNALS
TRAFFIC CONTROL
TRANSPORT