skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Qualification of the B and W Mark B fuel assembly for high burnup. First semi-annual progress report, July-December 1978

Technical Report ·
DOI:https://doi.org/10.2172/5814692· OSTI ID:5814692

Five Babcock and Wilcox standard Mark B (15 x 15) fuel assemblies are being irradiated in Duke Power Company's Oconee Unit 1 reactor under a research and development program sponsored by the U.S. Department of Energy. Valuable experimental data on fuel performance characteristics at burnups of > 40,000 MWd/mtU will be obtained from these assemblies. This information, at a duty approximately 20% greater than that achieved by typical discharged assemblies, will be used to qualify standard Mark B fuel assemblies for extended burnups. Efforts during this period included fuel cycle design and reload licensing of Oconee 1 for cycle 5, in which the assemblies are being irradiated, and nondestructive examination of the assemblies during the refueling outage between cycles 4 and 5. The Oconee 1 cycle 5 startup tests proceeded in a routine manner, and the reactor has operated with a 92% capacity factor since completion of power escalation testing on November 10, 1978. Irradiation of the fuel assemblies is currently in progress.

Research Organization:
Babcock and Wilcox Co., Lynchburg, VA (USA). Nuclear Power Generation Div.; Babcock and Wilcox Co., Alliance, OH (USA). Contract Research Div.; Babcock and Wilcox Co., Lynchburg, VA (USA). Research and Development Div.; Duke Power Co., Charlotte, NC (USA)
DOE Contract Number:
ET-78-C-02-4711
OSTI ID:
5814692
Report Number(s):
COO-4711-19; BAW-1546-1; TRN: 80-002424
Country of Publication:
United States
Language:
English