Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Application of risk-based methodologies to prioritize safety resources

Conference · · Transactions of the American Nuclear Society; (United States)
OSTI ID:5804435
; ;  [1]
  1. Electric Power Research Institute, Palo Alto, CA (United States)

The Electric Power Research Institute (EPRI) started a program entitled risk-based prioritization in 1992. The purpose of this program is to provide generic technical support to the nuclear power industry relative to its recent initiatives in the area of operations and maintenance (O M) cost control using state-of-the-art risk methods. The approach uses probabilistic risk assessment (PRA), or similar techniques, to allocate resources commensurate with the risk posed by nuclear plant operations. Specifically, those items or events that have high risk significance would receive the most attention, while those with little risk content would command fewer resources. As quantified in a companion paper,[close quote] the potential O M cost reduction inherent in this approach is very large. Furthermore, risk-based methods should also lead to safety improvements. This paper outlines the way that the EPRI technical work complements the technical, policy, and regulatory initiatives taken by others in the industry and provides an example of the approach as used to prioritize motor-operated valve (MOV) testing in response to US Nuclear Regulatory Commission (NRC) Generic Letter 89-10.

OSTI ID:
5804435
Report Number(s):
CONF-930601--
Journal Information:
Transactions of the American Nuclear Society; (United States), Journal Name: Transactions of the American Nuclear Society; (United States) Vol. 68; ISSN 0003-018X; ISSN TANSAO
Country of Publication:
United States
Language:
English