Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Combustible gas control in severe accidents

Conference · · Transactions of the American Nuclear Society; (United States)
OSTI ID:5802554
;  [1]
  1. ABB Combustion Engineering Nuclear Power, Inc., Windsor, CT (United States)

General Atomics (GA) is developing two legal-weight truck casks for shipping spent pressurized water reactor (PWR) and boiling water reactor (BWR) fuels from existing and proposed reactor facilities to a repository or monitored retrievable storage (MRS) facility. The GA-4 cask is designed to carry four PWR spent-fuel assemblies with a design-basis burnup level of 35 GWd/tonne U and a 10-yr cooling time. The GA-9 cask is designed to carry nine BWR spent-fuel assemblies with a design-basis burnup level of 30 GWd/tonne U and a 10-yr cooling time.

OSTI ID:
5802554
Report Number(s):
CONF-930601--
Journal Information:
Transactions of the American Nuclear Society; (United States), Journal Name: Transactions of the American Nuclear Society; (United States) Vol. 68; ISSN 0003-018X; ISSN TANSAO
Country of Publication:
United States
Language:
English