Maintenance scheduling
Conference
·
OSTI ID:5793913
The requirements for daily, weekly, monthly and overtime maintenance scheduling of coal-fired power plants are discussed. It is concluded that maintenance scheduling is as essential as the physical performance of the work itself. By prescheduling maintenance, the optimum utilization of manpower and equipment reliability will be obtained. Spare parts, special tools and service engineer requirements can be anticipated with reasonable scheduling. Meetings are a distasteful word in anyone's vocabulary. However, close communication, between operation and maintenance, is a must to insure that both departments are aware of the job status and progress. Improved communication and scheduling of equipment maintenance can help break down the barrier that has developed between the two Departments.
- Research Organization:
- Board of Water and Light, Lansing, MI (USA)
- OSTI ID:
- 5793913
- Report Number(s):
- CONF-8004173-6; ON: DE82900266
- Country of Publication:
- United States
- Language:
- English
Similar Records
CRITICAL PATH SCHEDULING IN MAINTENANCE
Electrostatic precipitator preventive maintenance
Maintenance scheduling
Technical Report
·
Sun Apr 09 23:00:00 EST 1961
·
OSTI ID:4019316
Electrostatic precipitator preventive maintenance
Journal Article
·
Wed Mar 31 23:00:00 EST 1976
· Heat., Piping Air Cond.; (United States)
·
OSTI ID:7348313
Maintenance scheduling
Journal Article
·
Sun Aug 01 00:00:00 EDT 1982
· IEEE Trans. Power Appar. Syst.; (United States)
·
OSTI ID:6005148