Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Cathodic protection of a guyed tower in 1000 feet of water

Journal Article · · Mater. Performance; (United States)
OSTI ID:5785167
The Lena guyed tower and its 20 associated guylines were installed in 1000 ft (305 m) of water in 1983 in Mississippi Canyon Block 280 in the Gulf of Mexico. The design, installation, post construction inspection, and routine monitoring of the 2.4 million lbs (1.1 million kg) of anodes, which provide underwater protection for the tower and guylines, are reviewed.
Research Organization:
Exxon Co. USA, P.O. Box 60626, New Orleans, LA 70160-0626
OSTI ID:
5785167
Journal Information:
Mater. Performance; (United States), Journal Name: Mater. Performance; (United States) Vol. 25:3; ISSN MTPFB
Country of Publication:
United States
Language:
English

Similar Records

Dynamic interaction of a guyed tower with its guying system
Conference · Fri Dec 31 23:00:00 EST 1982 · Am. Soc. Mech. Eng., (Pap.); (United States) · OSTI ID:5580228

Development of the guyed tower: A case history
Conference · Sat Oct 01 00:00:00 EDT 1983 · Soc. Pet. Eng. AIME, Pap.; (United States) · OSTI ID:5293344

Design of the Lena guyed tower
Conference · Tue May 01 00:00:00 EDT 1984 · Proc., Annu. Offshore Technol. Conf.; (United States) · OSTI ID:6454219