Collector main replacement at Indianapolis Coke

Conference ·
OSTI ID:577482
Indianapolis Coke is a merchant coke producer, supplying both foundry and blast furnace coke to the industry. The facility has three coke batteries: two 3 meter batteries, one Wilputte four divided and one Koppers Becker. Both batteries are underjet batteries and are producing 100% foundry coke at a net coking time of 30.6 hours. This paper deals with the No. 1 coke battery, which is a 72 oven, gun fired, 5 meter Still battery. No. 1 battery produces both foundry and blast furnace coke at a net coking rate of 25.4 hours. No. 1 battery was commissioned in 1979. The battery is equipped with a double collector main. Although many renovations have been completed to the battery, oven machinery and heating system, to date no major construction projects have taken place. Deterioration of the collector main was caused in part from elevated levels of chlorides in the flushing liquor, and temperature fluctuations within the collector main. The repair procedures are discussed.
OSTI ID:
577482
Report Number(s):
CONF-9704181--; ISBN 1-886362-23-8
Country of Publication:
United States
Language:
English

Similar Records

Fuel gas main replacement at Acme Steel's coke plant
Journal Article · Thu Sep 01 00:00:00 EDT 1994 · Iron and Steel Engineer; (United States) · OSTI ID:6968500

Application of quality improvement techniques to meet coke battery environmental regulations
Conference · Thu Dec 31 23:00:00 EST 1992 · Proceedings, Ironmaking Conference; (United States) · OSTI ID:6132476

VACASULF operation at Citizens Gas and Coke Utility
Conference · Thu Nov 30 23:00:00 EST 1995 · OSTI ID:129096