Great Lakes Steel -- PCI facility
- BMH Claudius Peters AG, Buxtehude (Germany)
- Raytheon Engineers and Constructors, Pittsburgh, PA (United States)
This paper discusses the planning, design, and start-up of the 90 tph PCI facility for National Steel`s Great Lakes Steel Division in River Rouge, MI. This project is owned and operated by Edison Energy Services, and was implemented on a fast-track basis by Raytheon Engineers and Constructors, Babcock Material Handling, and Babcock and Wilcox. This paper presents important process issues, basic design criteria, an the challenges of engineering and building a state-of-the-art PCI facility in two existing plants. Pulverized coal is prepared at the River Rouge Power Plant of Detroit Edison, is pneumatically conveyed 6,000 feet to a storage silo at Great Lakes Steel, and is injected into three blast furnaces.
- OSTI ID:
- 577439
- Report Number(s):
- CONF-9704181-; ISBN 1-886362-23-8; TRN: IM9809%%86
- Resource Relation:
- Conference: 56. Ironmaking conference proceedings, Chicago, IL (United States), 13-16 Apr 1997; Other Information: PBD: 1997; Related Information: Is Part Of Ironmaking conference proceedings: Volume 56; PB: 781 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Status of phase II subsystem testing in support of B and W`s advanced coal-fired low-emission boiler system
NO{sub x} control update for advanced low emission boiler system