Title: Layout arrangements for ehv dc transmission terminals

Journal Article · · Proc. Am. Power Conf.; (United States)
OSTI ID:5766089

One of the first two high voltage direct current terminals in the Western Hemisphere will be on the Pacific hvdc. Intertie at the Celilo Terminal near The Dalles, Oregon on the Bonneville Power Administrations system. It is to be initially rated 1440 MW plus or minus 400 kV, but eventually will have a capacity of 2880 MW. A turnkey contract for the first terminal was awarded in April 1965. It included responsibility for the building design and outdoor yard layout. Attractive appearance was also a factor to be considered in the design of the station.

OSTI ID:
5766089
Journal Information:
Proc. Am. Power Conf.; (United States), Vol. 28
Country of Publication:
United States
Language:
English

Similar Records

Environmental Assessment for the Terminal Expansion Project.
Technical Report · Fri Feb 01 00:00:00 EST 1985 · OSTI ID:5766089

Three terminal operation of the Pacific HVDC intertie for dc circuit breaker testing
Conference · Thu Jan 01 00:00:00 EST 1976 · IEEE Trans. Power Appar. Syst.; (United States) · OSTI ID:5766089

Layout arrangements for ehv - dc transmission terminals
Journal Article · Sat Jan 01 00:00:00 EST 1966 · Proc. Am. Power Conf.; (United States) · OSTI ID:5766089