Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Slurry walls and slurry trenches - construction quality control

Conference ·
OSTI ID:576477
;  [1]
  1. Mueser Rutledge Consulting Engineers, New York, NY (United States)
Slurry (panel) walls and slurry trenches have become conventional methods for construction of deep underground structures, interceptor trenches and hydraulic (cutoff) barriers. More recently polymers mixed with water are used to stabilize the excavation instead of bentonite slurry. Slurry walls are typically excavated in short panel segments, 2 to 7 m (7 to 23 ft) long, and backfilled with structural materials; whereas slurry trenches are fairly continuous excavations with concurrent backfilling of blended soils, or cement-bentonite mixtures. Slurry trench techniques have also been used to construct interceptor trenches. Currently no national standards exist for the design and/or construction of slurry walls/trenches. Government agencies, private consultants, contractors and trade groups have published specifications for construction of slurry walls/trenches. These specifications vary in complexity and quality of standards. Some place excessive emphasis on the preparation and control of bentonite or polymer slurry used for excavation, with insufficient emphasis placed on quality control of bottom cleaning, tremie concrete, backfill placement or requirements for the finished product. This has led to numerous quality problems, particularly with regard to identification of key depths, bottom sediments and proper backfill placement. This paper will discuss the inspection of slurry wall/trench construction process, identifying those areas which require special scrutiny. New approaches to inspection of slurry stabilized excavations are discussed.
Research Organization:
USDOE, Washington, DC (United States)
OSTI ID:
576477
Report Number(s):
CONF-970208--Proc.; ON: DE98001967
Country of Publication:
United States
Language:
English

Similar Records

Design and construction of a deep slurry trench barrier
Conference · Tue Dec 30 23:00:00 EST 1997 · OSTI ID:576509

Bentonite-water slurry rheology and cutoff wall trench stability
Conference · Tue Dec 30 23:00:00 EST 1997 · OSTI ID:567790

Bio-polymer slurry trench method for installation of in-situ air sparging system
Conference · Thu Aug 01 00:00:00 EDT 1996 · OSTI ID:269162