Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Gross decontamination experiment report

Technical Report ·
DOI:https://doi.org/10.2172/5757684· OSTI ID:5757684

A Gross Decontamination Experiment was conducted on various levels and surfaces of the TMI - Unit 2 reactor building in March 1982. The polar crane, D-rings, missile shields, refueling canals, refueling bridges, equipment, and elevations 305' and 347'-6'' were flushed with low pressure water. Additionally, floor surfaces on elevation 305' and floor surfaces and major pieces of equipment on elevation 347'-6'' were sprayed with high pressure water. Selective surfaces were decontaminated with a mechanical scrubber and chemicals. Strippable coating was tested and evaluated on equipment and floor surfaces. The effectiveness, efficiency, and safety of several decontamination techniques were established for the large, complex decontamination effort. Various decontamination equipment was evaluated and its effectiveness was documented. Decontamination training and procedures were documented and evaluated, as were the support system and organization for the experiment.

Research Organization:
Bechtel National, Inc., Oak Ridge, TN (USA)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
5757684
Report Number(s):
GEND-034; ON: DE83017046
Country of Publication:
United States
Language:
English