Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Aurora oil switch upgrade program

Technical Report ·
OSTI ID:5757599

This report describes the short pulse synchronization requirements, the original Aurora trigger scheme, and the PI/SNLA approach to improving the synchronization. It also describes the oil switching design study undertaken as the first phase of the program. A discussion of oil-switch closure analysis and the conceptual design motivated by this analysis are presented. This paper also describes the oil-switch trigger pulser tests required to validate the concept. This includes the design of the testing facility, a description of the test goals, and a discussion of the results. This paper finally describes oil-switch trigger pulser testing on one of the four Aurora Blumlein modules, which includes the hardware design and operation, the testing goals, hardware installation, and test results. 9 refs., 26 figs.

Research Organization:
Sandia National Labs., Albuquerque, NM (USA); Physics International Co., San Leandro, CA (USA)
DOE Contract Number:
AC04-76DP00789
OSTI ID:
5757599
Report Number(s):
SAND-89-7073; ON: DE89015192
Country of Publication:
United States
Language:
English