Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

Technical Report ·
OSTI ID:5749568
This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs.
Research Organization:
Westinghouse Hanford Co., Richland, WA (USA)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
5749568
Report Number(s):
WHC-EP-0045; ON: DE88002750
Country of Publication:
United States
Language:
English