Electric Utility Rate Design Study: an evaluation of reconciliation procedures for the design of marginal cost-based time-of-use rates
Technical Report
·
OSTI ID:5742311
A number of methods that have already been proposed for reconciling the difference between revenues with rates set at marginal costs and those revenues that would result from the prescribed accounting procedures is addressed. Two distinct but related reconciliation problems are addressed. The first relates to how the overall revenue difference is spread across customer classes while the second relates to how marginal costs are used to design rates which match the revenue target for each class. (MCW)
- Research Organization:
- Gordian Associates, Inc., New York (USA); Electric Power Research Inst., Palo Alto, CA (USA)
- OSTI ID:
- 5742311
- Report Number(s):
- NP-24247
- Country of Publication:
- United States
- Language:
- English
Similar Records
Electric Utility Rate Design Study: an evaluation of reconciliation procedures for the design of marginal-cost-based time-of-use rates
Electric Utility Rate Design Study: critical issues in costing approaches for time-differentiated rates
Wheeling rates based on marginal-cost theory
Technical Report
·
Tue Nov 06 23:00:00 EST 1979
·
OSTI ID:5650708
Electric Utility Rate Design Study: critical issues in costing approaches for time-differentiated rates
Technical Report
·
Wed Jan 11 23:00:00 EST 1978
·
OSTI ID:6867984
Wheeling rates based on marginal-cost theory
Journal Article
·
Tue Oct 31 23:00:00 EST 1989
· IEEE Transactions on Power Systems; (USA)
·
OSTI ID:5782512