skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Best management practices and work plan for installation of and monitoring at temporary weirs and flumes at NT-3, NT-4, and NT-5 Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

Technical Report ·
DOI:https://doi.org/10.2172/572703· OSTI ID:572703

This Best Management Practices (BMP) and Work Plan has been developed in order to maintain compliance with applicable regulatory requirements by documenting the practices that are required during the installation and maintenance of temporary weirs and flumes at the NT-3, NT-4, and NT-5 tributaries, subsequent collection of water discharge data, and removal of the weirs and flumes. The practices included in this BMP comply with the Clean Water Act and the intent of Sect. 70-8-104(b) of the Tennessee Code Annotated: Tennessee Wildlife Resources Commission Proclamation 94-16 to prevent the destruction of the habitat of state-listed wildlife species that are designated as {open_quotes}in need of management.{close_quotes}

Research Organization:
Oak Ridge Y-12 Plant (Y-12), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
AC05-84OS21400
OSTI ID:
572703
Report Number(s):
Y/ER/MS-11-Rev.1; ON: DE98004148; TRN: 98:009240
Resource Relation:
Other Information: PBD: Feb 1998
Country of Publication:
United States
Language:
English