Lessons Learned in the Cleanup of Three Mile Island Unit 2 as Determined by the TMI-2 Safety Advisory Board
The Three Mile Island Unit 2 Safety Advisor Board (SAB) was established on March 16, 1981, to provide GPU Nuclear Corporation management with a high-level, independent appraisal of the cleanup program as related to public and worker health safety. In its 7 1/2 yr of existence, the SAB has reviewed many aspects of cleanup activities, including regulations, safety, risk assessment, project organization, project financing, project procedures, technical planning, and public communications. The primary objective of the SAB has been to ensure the continued safety of the surrounding community and of the on-site work force. It was of paramount importance that the reactor plant be placed in a stable, controllable condition as soon as possible. The work of the SAB can be described under three major headings: scientific, engineering, and administrative. Included under the scientific heading is recriticality, environmental effects, and accident scenario. The engineering heading includes removal of fuel debris, methods of decontamination, control of personnel exposures, and personnel contamination control. The administrative heading includes over control of cleanup operations, cost and schedule control, organization, project planning, and communications with the public.
- Research Organization:
- Univ. of Florida, Gainesville, FL (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA), Nuclear Criticality Safety Program (NCSP)
- OSTI ID:
- 5711260
- Report Number(s):
- CONF-881011-; CODEN: TANSA
- Journal Information:
- Transactions of the American Nuclear Society, Vol. 57; Conference: Joint Meeting of the European Nuclear Society and the American Nuclear Society , Washington, DC (United States), 30 Oct - 4 Nov 1988; ISSN 0003-018X
- Publisher:
- American Nuclear Society
- Country of Publication:
- United States
- Language:
- English
Similar Records
Annual report to Congress, fiscal year 1997. A report by the Scientific Advisory Board of the Strategic Environmental Research and Development Program: Annual report number 6
US DOE Perspectives on Advisory Board Effectiveness - 13539
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
96 KNOWLEDGE MANAGEMENT AND PRESERVATION
98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL PROTECTION
DECONTAMINATION
PROGRAM MANAGEMENT
THREE MILE ISLAND-2 REACTOR
REACTOR ACCIDENTS
ACCURACY
ADMINISTRATIVE PROCEDURES
AEROSOLS
BORON
COMMUNICATIONS
CORIUM
CRITICALITY
ECONOMICS
EPRI
FINANCING
INSPECTION
LIGHTING SYSTEMS
MELTDOWN
NEUTRON ABSORBERS
OCCUPATIONAL EXPOSURE
PERSONNEL
PIPES
PLANNING
PRESSURE VESSELS
PROTECTIVE CLOTHING
PUBLIC HEALTH
PUBLIC RELATIONS
RADIATION PROTECTION
REACTOR CORE DISRUPTION
REGULATIONS
REMOTE VIEWING EQUIPMENT
RISK ASSESSMENT
SAFETY
SOURCE TERMS
SPECIFICATIONS
TELEVISION CAMERAS
TOOLS
TRAINING
US DOE
US NRC
ACCIDENTS
CAMERAS
CLEANING
CLOTHING
COLLOIDS
CONTAINERS
DISPERSIONS
ELEMENTS
ENERGY SYSTEMS
ENRICHED URANIUM REACTORS
EQUIPMENT
MANAGEMENT
NATIONAL ORGANIZATIONS
POWER REACTORS
PWR TYPE REACTORS
REACTORS
SEMIMETALS
SOLS
THERMAL REACTORS
US ORGANIZATIONS
WATER COOLED REACTORS
WATER MODERATED REACTORS
Nuclear Criticality Safety Program (NCSP)
Three Mile Island Unit 2
Safety Advisor Board (SAB)
Cleanup Program Appraisal
220900* - Nuclear Reactor Technology- Reactor Safety
210200 - Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled