The CBA (Colliding Beam Accelerator, formerly known as ISABELLE) Full Cell Magnet System consisting of six superconducting dipole magnets and two superconducting quadrupole magnets requires two separate vacuum systems. One, known as beam vacuum operates below 3 x 10/sup -11/ Torr and the other, known as insulating vacuum, operates at less than 10/sup -7/ Torr to isolate cryo circuits from atmosphere and from the uhv beam tubes. The uhv bore tube is isolated from the 4.0/sup 0/K magnet by thirty-six (36) layers of superinsulation and insulating vacuum. Heat load measurements on the bore tube have been completed and found to agree with data obtained in smaller controlled experiments. Measurements of helium, accumulated on cryogenic pumped charcoal panels over many weeks, have verified sensitive helium mass spectrometer leak detection methods for vacuum integrity, providing sound design of the welded complex. The Full Cell was assembled and operated under conditions that would exist in the completed machine. Pressures below 2 x 10/sup -11/ Torr beam vacuum requirement and below 2 x 10/sup -7/ Torr insulating vacuum, were routinely achieved during all phases of the Full Cell operation and support systems testing.
Research Organization:
Brookhaven National Lab., Upton, NY (USA)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
5708562
Report Number(s):
BNL-33742; CONF-831171-11; ON: DE84002576
Country of Publication:
United States
Language:
English

Similar Records

Evaluation of the colliding beam accelerator first string full cell vacuum system
Journal Article · Sat Mar 31 23:00:00 EST 1984 · J. Vac. Sci. Technol., A; (United States) · OSTI ID:6735044

ISABELLE vacuum systems
Conference · Mon Dec 31 23:00:00 EST 1979 · OSTI ID:5062456

Leak checking in ISABELLE
Conference · Wed Dec 31 23:00:00 EST 1980 · OSTI ID:6553752