skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site]

Abstract

The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8more » refs., 46 figs., 23 tabs.« less

Authors:
;
Publication Date:
Research Org.:
Westinghouse Savannah River Co., Aiken, SC (USA)
Sponsoring Org.:
USDOE; USDOE, Washington, DC (USA)
OSTI Identifier:
5707423
Report Number(s):
WSRC-RP-89-978
ON: DE91010036
DOE Contract Number:  
AC09-89SR18035
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; CONTAMINATION; MINIMIZATION; REGULATIONS; COMPLIANCE; SAVANNAH RIVER PLANT; WASTE MANAGEMENT; DECOMMISSIONING; ENVIRONMENTAL IMPACTS; HEALTH HAZARDS; PROGRAM MANAGEMENT; QUALITY ASSURANCE; REMEDIAL ACTION; RISK ASSESSMENT; HAZARDS; MANAGEMENT; NATIONAL ORGANIZATIONS; US AEC; US DOE; US ERDA; US ORGANIZATIONS; 052000* - Nuclear Fuels- Waste Management; 053000 - Nuclear Fuels- Environmental Aspects; 054000 - Nuclear Fuels- Health & Safety

Citation Formats

Hutchison, J, and Jernigan, G. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site]. United States: N. p., 1989. Web. doi:10.2172/5707423.
Hutchison, J, & Jernigan, G. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site]. United States. doi:10.2172/5707423.
Hutchison, J, and Jernigan, G. Fri . "Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site]". United States. doi:10.2172/5707423. https://www.osti.gov/servlets/purl/5707423.
@article{osti_5707423,
title = {Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site]},
author = {Hutchison, J and Jernigan, G},
abstractNote = {The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.},
doi = {10.2172/5707423},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1989},
month = {12}
}

Technical Report:

Save / Share: