SRC-II Demonstration Project. Phase zero, task number 15: deliverable number 12. Volume 3, Appendix B. Plan and estimated cost for Phases I, II and III: project baseline plans

Technical Report ·
DOI:https://doi.org/10.2172/5701888· OSTI ID:5701888
This volume contains the integrated workscope, schedule, and cost baselines for the SRC-II Demonstration Project developed in parallel with the Phase Zero Conceptual Design effort by The Pittsburg and Midway Coal Mining Co. (P and M). This volume contains a restatement of the Project objectives, a description of major planning guidelines, and Project baselines. In addition, it contains a list of documents recommended by P and M for delivery in Phase I and projected funding requirements for the Demonstration Project. The baselines reflect P and M's best estimate of the work required to achieve completion of mechanical construction by December 1983 and the associated costs for the Project. The baselines represent the operational planning which P and M will implement as the prime contractor to the Department of Energy. Volume 3 has been separated from the PMP to permit flexibility in updating the Project baseline. Updating will occur as the uncertainties and design problems are resolved during evolution of the Project.
Research Organization:
Pittsburgh and Midway Coal Mining Co., Denver, CO (USA)
OSTI ID:
5701888
Report Number(s):
FE-3055-T3(Vol.3)
Country of Publication:
United States
Language:
English