Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Remote mixed oxide fabrication facility development. Volume 1: reference facility

Technical Report ·
OSTI ID:5697570
The general objective of Task 201 is to present a conceptual design of a remotely operated and maintained fuel fabrication facility. This document, the first of three volumes, describes the reference facility as based on the current design of the Westinghouse Recycle Fuels Plant modified to include the objectives of the Fuels Refabrication and Development (FRAD) program. Included are descriptions of the facility design basis and layout, the manufacturing process, and the auxiliary and support services.
Research Organization:
Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear Energy Systems Div.
DOE Contract Number:
EY-76-C-06-1830
OSTI ID:
5697570
Report Number(s):
WCAP-9471
Country of Publication:
United States
Language:
English