Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Determination of cost effective waste management system receipt rates

Conference ·
OSTI ID:5687723
A comprehensive logistics and cost analysis has been carried out to determine if there are potential benefits to the high-level waste management system for receipt rates other than the current 3000 MTU/yr design-basis. The analysis includes both a Repository-Only System and a Storage-Only System. Repository startup dates of 2010 and 2015 and MRS startup dates of 1988 and three years prior to the repository have been evaluated. Receipt rates ranging from 1,500 to 6, 000 MTU/yr have been considered. Higher receipt rates appear to be economically justified, for either system, minimum costs are found at a repository receipt rate of 6000 MTU/yr. However, the MRS receipt rate for minimum system costs depends on the MRS startup date. With a 1988 MRS and a 2010 repository, the added cost of providing the MRS is offset by at-reactor storage cost reductions and the total system cost of $10.0 billion is virtually the same as for the repository- only system. 9 refs., 8 figs., 3 tabs.
Research Organization:
Pacific Northwest Lab., Richland, WA (USA)
Sponsoring Organization:
DOE; USDOE, Washington, DC (USA)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
5687723
Report Number(s):
PNL-SA-18764; CONF-910435--84; ON: DE91012924
Country of Publication:
United States
Language:
English