Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Decontamination and decommissioning of building 889 at Rocky Flats Environmental Technology Site

Journal Article · · Radwaste Magazine
OSTI ID:567966
 [1]; ;  [2];  [3]
  1. Kaiser-Hill Co., Golden, CO (United States)
  2. Rocky Mountain Remediation Services, Golden, CO (United States)
  3. Scientific Ecology Group, Golden, CO (United States)
At the Rocky Flats site, the building 889 decommissioning project was the first large-scale decommissioning project of a radiologically contaminated facility at Rocky Flats. The scope consisted of removal of all equipment and utility systems from the interior of the building, decontamination of interior building surfaces, and the demolition of the facility to ground level. Details of the project management plan, including schedule, engineering, cost, characterization methodologies, decontamination techniques, radiological control requirements, and demolition methods, are provided in this article. 1 fig., 3 tabs.
OSTI ID:
567966
Journal Information:
Radwaste Magazine, Journal Name: Radwaste Magazine Journal Issue: 5 Vol. 4; ISSN 1070-9541; ISSN RDMGEK
Country of Publication:
United States
Language:
English

Similar Records

DECOMMISSIONING CHALLENGES AT THE ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE
Conference · Sun Feb 24 23:00:00 EST 2002 · OSTI ID:833139

Decommissioning successes at Rocky Flats Environmental Technology Site
Journal Article · Thu Jul 01 00:00:00 EDT 1999 · Transactions of the American Nuclear Society · OSTI ID:20005725

Site wide integration of the Rocky Flats closure project
Conference · Mon Jun 01 00:00:00 EDT 1998 · OSTI ID:663354