Engineering-support services for the DOE/GRI coal-gasification research program. Quarterly technical progress report, April-June 1981

Technical Report ·
OSTI ID:5678358
Kellog activities during April to June 1981 included continued monitoring of activities at Bi-Gas, Westinghouse, Exxon and IGT (for peat gasification). Pilot plant/PDU tests which were monitored and reported include Bi-Gas tests G-16B, G-17, G-17A, G-17B, and G-17C; Westinghouse PDU test runs TP-029-1/030-1, TP-030-2 and TP-028-1 and CFSF tests TP-M002-1 and TP-M002-2; Exxon run period number 28; Peatgas pilot plant Test RF-1 and gasification Test number 1; and IGT single-stage peat gasification PDU Tests BF-13 through BF-20. Significant milestones were reached with the issue of draft reports for several tasks, including carbonyl formation, peat harvesting/dewatering, technical/economic assessments of Exxon, Westinghouse and PeatGas, technical/economic comparison of Westinghouse and U-Gas, gasifier design, safety audits, Hygas data base evaluation and the safety assurance study. In addition, final reports were issued for the Westinghouse oxygen blown gasifier risk analysis and for the PDU screening evaluations of Exxon, Westinghouse and Rockwell. Work on the Peatgas PDU data base evaluation continued, and a review of the Hygas final report was begun.
Research Organization:
Kellogg (M.W.) Co., Houston, TX (USA)
DOE Contract Number:
AC01-78ET10324
OSTI ID:
5678358
Report Number(s):
DOE/ET/10324-T53; FE-2778-60; ON: DE83011001
Country of Publication:
United States
Language:
English