Water conservation study. Badger Army Ammunition Plant, Baraboo, Wisconsin. Final report
The purpose of this water conservation study is to identify projects which result in energy maintenance and cost savings in the process water distribution system at Badger Army Ammunition Plant (BAAP) in Baraboo, Wisconsin. A leak detection survey was performed on all process water piping with a diameter of 6 inches or greater. The leak detection analysis was performed using a combination of listening devices and preamplified-transducer systems to identify the majority of leak locations. When the location of the leak could not be readily identified using these methods, a leak correlator was used. The leak correlator determines leak location based on the time it takes for sound to travel from the leak to a waterline connection point.
- Research Organization:
- EMC Engineers, Inc., Denver, CO (United States)
- OSTI ID:
- 565463
- Report Number(s):
- AD-A-331839/1/XAB; EMC-1406-004; CNN: Contract DACA01-94-D-0033; TRN: 80200415
- Resource Relation:
- Other Information: PBD: May 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Remedial investigation/feasibility study badger army ammunition plant Baraboo, Wisconsin. Volume 2. Feasibility study report
Remedial investigation/feasibility study badger army ammunition plant Baraboo, Wisconsin. Volume 1. Feasibility study report