Energy savings opportunity survey, Energy Engineering Analysis Program, Fort Gordon, Georgia: Executive summary. Final report
Technical Report
·
OSTI ID:564674
This is the pre-final submittal of an Energy Savings Opportunity Survey (ESOS) performed at Fort Gordon, GA. This report presents potential energy conservation projects for this Installation. These projects, consisting of Energy Conservation Opportunities (ECOs), are summarized in Tables 1 and 2. The projects were developed based on project packaging instructions from the Installation and on follow-up phone calls with The Directorate of Installation Support (DIS). The ECOs have been extended to include buildings similar to those surveyed by the architect/engineer. Similarity was based on instructions from the Installation and on follow-up phone calls with DIS. Table 3 lists the buildings surveyed. Thirty nine buildings were surveyed totaling approximately 800,000 square feet. Of these, one was an example of Family Housing and 38 were examples of non-housing buildings. Over one hundred ECOs were considered at Fort Gordon. Of these 39 were applicable in non-housing and 5 in Family Housing.
- Research Organization:
- Heery Energy Consultants, Inc., Atlanta, GA (United States)
- OSTI ID:
- 564674
- Report Number(s):
- AD-A--330425/0/XAB; CNN: Contract DACA21-85-C-0614
- Country of Publication:
- United States
- Language:
- English
Similar Records
Energy savings opportunity survey, Energy Engineering Analysis Program, Fort Benning, Georgia; executive summary. Final report
Energy savings opportunity survey, Fort Riley, Kansas; executive summary
Energy savings opportunity survey, Fort Belvoir, Alexandria, Virginia. Volume 1: Executive summary. Volume 2: Engineering study. Final report
Technical Report
·
Wed Aug 24 00:00:00 EDT 1988
·
OSTI ID:564647
Energy savings opportunity survey, Fort Riley, Kansas; executive summary
Technical Report
·
Wed Jul 01 00:00:00 EDT 1987
·
OSTI ID:564528
Energy savings opportunity survey, Fort Belvoir, Alexandria, Virginia. Volume 1: Executive summary. Volume 2: Engineering study. Final report
Technical Report
·
Thu Aug 01 00:00:00 EDT 1991
·
OSTI ID:564330