Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Basewide energy study, Fort Indiantown Gap: Volume 1 - executive summary. Final report

Technical Report ·
OSTI ID:564588
The purpose of this Executive Summary is to summarize the results of the EEAP. The Army Energy Plan, established in early 1978, sets both short and long term energy goals for the Army consistent with the Presidential Executive Order 12003 issued in mid-1977. It directs the Major Army commands to develop detailed implementation plans and funding documents. The National Energy Conservation Policy Act (NECPA) of 1978, directs that all facilities owned and operated by a Federal Agency must have all energy conservation retrofits performed by 1 January 1990. The Department of the Army, through the Corps of Engineers Baltimore, has contracted with XENERGY Inc. to provide the Energy Engineering Analysis Program (EEAP) at Fort Indiantown Gap under contract number DACA31-85-0117. The results of the study are indicated in detail in the main report. Backup calculations have been provided under separate volumes to the Corps of Engineers.
Research Organization:
XENERGY, Inc., Burlington, MA (United States)
OSTI ID:
564588
Report Number(s):
AD-A--330222/1/XAB
Country of Publication:
United States
Language:
English