Energy engineering analysis program, Irwin Army Community Hospital, Fort Riley, Kansas. Volume 1 of 3 - executive summary. Final report
Technical Report
·
OSTI ID:564503
This report covers the Final Submittal for Study of Irwin Army Community Hospital Energy Engineering Analysis Program, Fort Riley, Kansas. This study was initiated by the establishment of a computer model of the five building hospital complex as it now exists. Utility data was collected and analyzed to ascertain the present levels of gas and electricity consumption. The project team constructed an energy profile for the hospital complex using inputs from the building drawings, data gathered from the site visits, profile was validated by comparing the results to the utility bills and making minor adjustments to some parameters. An Interim Submittal covering the field survey data and preliminary analysis of all identified Energy Conservation Measures (ECO`s) was submitted for review May 3, 1991. A design review conference was accomplished at Fort Riley, Kansas on July 16, 1991. A Prefinal Submittal covering the finalized ECO calculations and preliminary project development brochures was submitted for review September 1991. A review conference was held at Fort Riley in November 1991. The Final Submittal is a finalizing of project calculations incorporating the reviewing agencies comments.
- Research Organization:
- Massaglia Neustrom Bredson, Inc., Kansas City, MO (United States)
- OSTI ID:
- 564503
- Report Number(s):
- AD-A--330710/5/XAB; CNN: Contract DACA41-90-C-0114
- Country of Publication:
- United States
- Language:
- English
Similar Records
Energy Engineering Analysis Program. Irwin Army Community Hospital, Fort Riley, Kansas. Volume 2. Narrative. Final report
Energy savings opportunity survey, Fort Riley, Kansas; executive summary
Volume I: Feasibility study for HVAC upgrade Fort Riley, Kansas. Energy Engineering Analysis Program (EEAP). Final report
Technical Report
·
Tue Dec 31 23:00:00 EST 1991
·
OSTI ID:564514
Energy savings opportunity survey, Fort Riley, Kansas; executive summary
Technical Report
·
Wed Jul 01 00:00:00 EDT 1987
·
OSTI ID:564528
Volume I: Feasibility study for HVAC upgrade Fort Riley, Kansas. Energy Engineering Analysis Program (EEAP). Final report
Technical Report
·
Tue Aug 01 00:00:00 EDT 1995
·
OSTI ID:557387