Chilled water study EEAP program for Walter Reed Army Medical Center
Technical Report
·
OSTI ID:564316
This study points out and identifies the known shortages in the current Chilled Water Plants. The study is subject to the rules and regulation of the EEAP Program. Under the requirements of this study, all recommended alternatives must meet specified payback and SIR standards. By expanding the plant size to accommodate known shortages, we are negatively impacting the evaluation standards by which each alternative is measured. Entech agrees that a new Central Plant would dramatically improve WRAMC`s operations, maintenance, and controllability. Unfortunately, a new Chilled Water Plant of this magnitude cannot be financed soley on energy and maintenance savings.
- Research Organization:
- Entech Engineering, Inc., Reading, PA (United States)
- OSTI ID:
- 564316
- Report Number(s):
- AD-A--330430/0/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Chilled water study EEAP program for Walter Reed Army Medical Center: Book 2. Final report
Chilled water study EEAP program for Walter Reed Army Medical Center. Book 1. Final Submission
Energy savings opportunity survey at Walter Reed Army Medical Center, Washington, DC. Final Submittal report
Technical Report
·
Wed Jan 31 23:00:00 EST 1996
·
OSTI ID:562698
Chilled water study EEAP program for Walter Reed Army Medical Center. Book 1. Final Submission
Technical Report
·
Wed Jan 31 23:00:00 EST 1996
·
OSTI ID:562651
Energy savings opportunity survey at Walter Reed Army Medical Center, Washington, DC. Final Submittal report
Technical Report
·
Thu Oct 22 00:00:00 EDT 1987
·
OSTI ID:562701