Closeout of IE Bulletin 80-20: failures of Westinghouse Type W-2 spring return to neutral control switches

Technical Report ·
OSTI ID:5638549
On June 18, 1980, Commonwealth Edison Company submitted Licensee Event Report (LER) 50-295/80-24 to the NRC, describing a malfunction of a Westinghouse Type W-2 control switch important to safety at Zion Unit 1. On the same date, Westinghouse submitted a preliminary issue of Technical Bulletin NSD-TB-80-9 to the NRC on the subject switches. On July 31, 1980, IE Bulletin 80-20 was issued to all power plant licensees and permit holders, requiring them to take specific actions and report results. Evaluation of utility responses and NRC/IE inspection reports shows that the bulletin can be closed out per specific criteria for 122 (98%) of the 124 current facilities to which it was issued. A followup item for the remaining two facilities is proposed for use by NRC/IE, to ensure satisfactory completion of corrective action.
Research Organization:
Parameter, Inc., Elm Grove, WI (USA)
OSTI ID:
5638549
Report Number(s):
NUREG/CR-3962; ON: TI86901488
Country of Publication:
United States
Language:
English