Development of turbodrill tachometer. Final report
The objective of the study was to develop a tachometer for use with the METC turbodrills. Tachometers are needed to allow efficient operation of the turbodrills. The operating speed of the turbodrills is now unknown, resulting occasionally in excessive operating speeds and rapid bit wear. In some applications, good tachometers could increase the footage drilled per bit run and greatly reduce drilling costs. This project resulted in the successful testing of a prototype turbodrill tachometer. The tachometer utilizes a set of partially blanked turbine blades in the motor section of the turbodrill which produce one pressure pulse each time the turbodrill rotates one revolution. The pressure pulses are transmitted through the drilling mud in the drill pipe to the surface where they are detected and processed. The frequency of the pulse signals is a direct measure of the turbodrill rotary speed. Numerous laboratory tests of the pulse tachometer were conducted at Maurer Engineering's turbodrill facility in Houston, Texas. Motor test stand comparisons of the mud pulse tachometer with direct magnetic and optical tachometers usually demonstrated excellent agreement. The tachometer performed well at depths in excess of 10,000 feet in Los Alamos Scientific Laboratories' EE-2 geothermal well. Water was used as the drilling fluid in these tests. The tachometer allowed continual monitoring and control of the LASL turbodrill speed. This attributed, in large part, to the success of the LASL turbodrills. Over 20 successful turbodrill boreholes were made using the tachometer. Although attenuatin is greater in viscous drilling mud than in water, theory indicates that the pulse tachometer should be effective with viscous muds even at depths of 10,000 to 20,000 feet.
- Research Organization:
- Maurer Engineering, Inc., Houston, TX (USA)
- DOE Contract Number:
- AC21-79MC11251
- OSTI ID:
- 5630695
- Report Number(s):
- DOE/MC/11251-1442; ON: DE83016342
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development of turbodrill tachometer
Field testing advanced geothermal turbodrill (AGT). Phase 1 final report
Geothermal turbodrill field tests
Conference
·
Mon Sep 01 00:00:00 EDT 1980
· Trans. - Geotherm. Resour. Counc.; (United States)
·
OSTI ID:6426876
Field testing advanced geothermal turbodrill (AGT). Phase 1 final report
Technical Report
·
Tue Jun 01 00:00:00 EDT 1999
·
OSTI ID:354890
Geothermal turbodrill field tests
Conference
·
Sun Dec 31 23:00:00 EST 1978
·
OSTI ID:6081040
Related Subjects
02 PETROLEUM
020200* -- Petroleum-- Reserves
Geology
& Exploration
42 ENGINEERING
420206 -- Engineering-- Mining & Drilling Equipment & Facilities-- (1980-1989)
ANGULAR VELOCITY
ATTENUATION
DRILL BITS
DRILLING EQUIPMENT
DRILLING RIGS
DRILLS
EQUIPMENT
EXPLORATION
GEOLOGIC DEPOSITS
GEOTHERMAL RESOURCES
Geothermal Legacy
MEASURING METHODS
MINERAL RESOURCES
MWD SYSTEMS
PETROLEUM DEPOSITS
PULSE TECHNIQUES
PULSES
RECOMMENDATIONS
RESOURCES
ROTARY DRILLS
VELOCITY
WEAR
020200* -- Petroleum-- Reserves
Geology
& Exploration
42 ENGINEERING
420206 -- Engineering-- Mining & Drilling Equipment & Facilities-- (1980-1989)
ANGULAR VELOCITY
ATTENUATION
DRILL BITS
DRILLING EQUIPMENT
DRILLING RIGS
DRILLS
EQUIPMENT
EXPLORATION
GEOLOGIC DEPOSITS
GEOTHERMAL RESOURCES
Geothermal Legacy
MEASURING METHODS
MINERAL RESOURCES
MWD SYSTEMS
PETROLEUM DEPOSITS
PULSE TECHNIQUES
PULSES
RECOMMENDATIONS
RESOURCES
ROTARY DRILLS
VELOCITY
WEAR