Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Reliability allocation in nuclear power plants

Conference ·
OSTI ID:5630476
The technical feasibility of allocating reliability and risk to reactor systems, subsystems, components, operations, and structures is investigated. A methodology is discussed which identifies top level risk indices as objective functions and plant-specific performance variables as decision variables. These are related by a risk model which includes cost as a top level risk index. A multiobjective optimization procedure is used to find non-inferior solutions in terms of the objective functions and the decision variables. The approach is illustrated for a boiling water reactor plant. The use of the methodology for both operating reactors and for advanced designs is briefly discussed. 16 refs., 1 fig.
Research Organization:
Brookhaven National Lab., Upton, NY (USA)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
5630476
Report Number(s):
BNL-NUREG-36056; CONF-850809-48; ON: TI85010230
Country of Publication:
United States
Language:
English