Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Northeast Corridor improvement project draft environmental impact statement/report for electrification of Northwest Corridor, New Haven, CT. to Boston, MA. Volume 3. Technical appendices. Final report, September 1992-September 1993

Technical Report ·
OSTI ID:5628263

The impacts of extending electrification on the National Railroad Passenger Corporation's (Amtrak) Northeast Corridor (NEC) from New Haven, Connecticut to Boston, Massachusetts are of direct concern to the Federal Railroad Administration (FRA). To improve rail service and increase ridership between New York and Boston, Amtrak proposes the electrification of the NEC main line between New Haven, CT and Boston, MA using an overhead 2 x 25,000 volt - 60 hertz power system. The volume Number III contains the detailed technical studies that were performed in order to identify and evaluate the environmental impacts of the proposed project. Some of these studies have been included entirely in the Draft Environmental Impact Statements-draft (DEIS/R) (Volume 1). The technical evaluations performed were based upon regulatory requirements as well as substantive issues raised by individuals and public agencies as part of the public participation program.

Research Organization:
Department of Transportation, Cambridge, MA (United States). John A. Volpe National Transportation Systems Center
OSTI ID:
5628263
Report Number(s):
PB-94-111838/XAB; DOT-VNTSC-FRA--93-9-VOL-3; CNN: DTRS-57-91-D-00052
Country of Publication:
United States
Language:
English