Energy engineering analysis, Fort Leonard Wood, Missouri, Volume 1a. Executive summary. Final report
Technical Report
·
OSTI ID:562666
Throughout the course of this study, it became evident that not only was Fort Leonard Wood failing to achieve projected savings for ECIPs accomplished to date, but the basewide energy consumption was increasing above that established by the FY75 base year. As a consequence of this increased consumption, the calculated ECIP energy savings to FY85 falls short of the 25 percent Army Facilities Energy goal. This increase in consumption has occurred primarily from FY8O to FY8l (see Figure 3.2.1-A). The following discussion will enumerate several explanations for the recent increases in energy consumption as well as the failure to meet projected ECIP goals to date. It should be noted that if the sharp increase between FY8O - FY8l is only a temporary trend, the base may meet TRADOC`s FY85 goals through ECIP, maintenance, repair, and energy management actions proposed in this study.
- Research Organization:
- Engineering Design and Management, Inc., St. Louis, MO (United States)
- OSTI ID:
- 562666
- Report Number(s):
- AD-A--330869/9/XAB; CNN: Contract DACA45-80-C-0143
- Country of Publication:
- United States
- Language:
- English
Similar Records
Final submittal: Increments A, B, F, G, Fort Story, Energy Engineering Analysis Program: Executive summary. Final report
Fuel selection study for Fort Leonard Wood, Missouri. Volume 2. Final report
Fuel selection study for Fort Leonard Wood, Missouri. Volume 1. Final report
Technical Report
·
Mon Dec 30 23:00:00 EST 1985
·
OSTI ID:562648
Fuel selection study for Fort Leonard Wood, Missouri. Volume 2. Final report
Technical Report
·
Thu May 01 00:00:00 EDT 1975
·
OSTI ID:7343501
Fuel selection study for Fort Leonard Wood, Missouri. Volume 1. Final report
Technical Report
·
Thu May 01 00:00:00 EDT 1975
·
OSTI ID:7217023