Energy savings opportunity survey, energy Engineering Analysis Program (EEAP), Fort Campbell, Kentucky, final report - phase 2; executive summary. Final report
Technical Report
·
OSTI ID:562653
Systems Corp surveyed and completed energy analyses for 112 buildings, two generators, four chillers, and roadway lighting. The energy conservation opportunities (ECOs) evaluated were lighting efficiency improvements, peak-shaving generators, chiller replacement, variable speed circulation pumps, EMCS expansion, and Commissary lighting. Cost estimates were prepared using M-CACES. Life cycle cost analyses were performed using the Life Cycle Cost in Design (LCCID) computer program. Project development brochures (PDBs) and DD1391 forms were prepared for Energy Conservation Investment Program (ECIP) projects. The projects that were developed represent $187,203 in annual savings with favorable simple paybacks and savings to investment ratios (SIRs).
- Research Organization:
- Systems Engineering and Management Corp., Knoxville, TN (United States)
- OSTI ID:
- 562653
- Report Number(s):
- AD-A--330834/3/XAB; CNN: Contract DACA27-93-C-0096
- Country of Publication:
- United States
- Language:
- English
Similar Records
Energy savings opportunity survey Energy Engineering Analysis Program (EEAP) Fort Campbell, Kentucky, Phase II. Volume 1, section 1-3. Final report
Energy savings opportunity survey, Energy Engineering Analysis Program (EEAP), Fort Campbell, Kentucky, final report - phase I. Executive summary. Final report
Energy savings opportunity survey, Energy Engineering Analysis Program (EEAP), Fort Campbell, Kentucky. Phase I, volume 1, sections 1-4. Final report
Technical Report
·
Sun Oct 31 23:00:00 EST 1993
·
OSTI ID:557381
Energy savings opportunity survey, Energy Engineering Analysis Program (EEAP), Fort Campbell, Kentucky, final report - phase I. Executive summary. Final report
Technical Report
·
Thu Nov 11 23:00:00 EST 1993
·
OSTI ID:564576
Energy savings opportunity survey, Energy Engineering Analysis Program (EEAP), Fort Campbell, Kentucky. Phase I, volume 1, sections 1-4. Final report
Technical Report
·
Thu Nov 11 23:00:00 EST 1993
·
OSTI ID:564319