Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Fort St. Vrain refueling equipment calculations versus measurements

Technical Report ·
DOI:https://doi.org/10.2172/5622844· OSTI ID:5622844

Gamma-ray dose rate measurements made during the first refueling of the Fort St. Vrain HTGR (owned and operated by the Public Service Company of Colorado) were compared with calculations in order to check the adequacy of the refueling equipment shielding, validate the analytical methods used, and provide design guidance for the shielding design of future HTGRs.

Research Organization:
General Atomic Co., San Diego, CA (USA)
OSTI ID:
5622844
Report Number(s):
GA-A-15451
Country of Publication:
United States
Language:
English