Power generation scheduling for multi-area hydro-thermal systems with tie line constraints, cascaded reservoirs and uncertain data
- Illinois Inst. of Tech., Chicago, IL (United States)
This paper proposes a new approach to solve the short-term generation scheduling of large-scale hydro-thermal power systems (GSHT). The objective of GSHT is to minimize the total operation cost of thermal units over the scheduling time horizon. In order to solve the problem within a reasonable time, the problem is decomposed into thermal and hydro subproblems. The coordinator between these subproblems is the system La-grange multiplier. For the thermal subproblem, in a multi-area power pool, it is necessary to coordinate the area generations for reducing the operation cost without violating tie limits. A probabilistic method is employed in considering load forecasting errors and forced outages of generating units to satisfy system reliability requirements. For the hydro subsystem, network flow concepts are adopted to coordinate water usage over the entire study time span and the reduced gradient method is used to overcome the linear characteristic of the network flow method in order to obtain the optimal solution. Three case studies for the proposed method are presented.
- OSTI ID:
- 5617185
- Journal Information:
- IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (United States), Vol. 8:3; ISSN 0885-8950
- Country of Publication:
- United States
- Language:
- English
Similar Records
Optimal short-term scheduling for a large-scale cascaded hydro system
A decomposition approach to non-linear multi-area generation scheduling with tie-line constraints using expert systems