Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Applying wind turbines and battery storage to defer Orcas Power and Light Company distribution circuit upgrades

Technical Report ·
DOI:https://doi.org/10.2172/560719· OSTI ID:560719
;  [1]
  1. Zaininger Engineering Co., Inc., San Jose, CA (United States)
The purpose of this study is to conduct a detailed assessment of the Orcas Power and Light Company (OPALCO) system to determine the potential for deferring the costly upgrade of the 25-kV Lopez- Eastsound circuit, by the application of a MW-scale wind farm and battery storage facilities as appropriate. Local wind resource data has been collected over the past year and used to determine MW-scale wind farm performance. This hourly wind farm performance data is used with measured hourly Eastsound load data, and recent OPALCO distribution system expansion plans and cost projections in performing this detailed benefit-cost assessment. The OPALCO distribution circuit expansion project and assumptions are described. MW-scale wind farm performance results are given. The economic benefit-cost results for the wind farm and battery storage applications on the OPALCO system using OPALCO system design criteria and cost assumptions are reported. A recalculation is presented of the benefit-cost results for similar potential wind farm and battery storage applications on other utility systems with higher marginal energy and demand costs. Conclusions and recommendations are presented.
Research Organization:
Oak Ridge National Lab., TN (United States)
Sponsoring Organization:
USDOE Assistant Secretary for Energy Efficiency and Renewable Energy, Washington, DC (United States)
DOE Contract Number:
AC05-96OR22464; AC04-94AL85000
OSTI ID:
560719
Report Number(s):
ORNL/Sub--96-SV115/1; ON: DE98051659; BR: AK 05 00
Country of Publication:
United States
Language:
English