Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Facility effluent monitoring plan for the plutonium-uranium extraction facility

Technical Report ·
OSTI ID:5605136
 [1];  [2]
  1. Westinghouse Hanford Co., Richland, WA (United States)
  2. Los Alamos Technical Associates, Inc., NM (United States)
A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
5605136
Report Number(s):
WHC-EP-0468; ON: DE92008552
Country of Publication:
United States
Language:
English