Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Big hole measurement while drilling

Conference ·
OSTI ID:5596551

Studies of the drilling performance of the CALVERT 27 drilling rig, located at the Nevada Test Site (NTS), comparing the old four (4) inch mudline and three and one half (3-1/2) inch rotary hose to the new six (6) inch mudline and five (5) inch rotary hose found that operating costs and operating air and mudpump pressures had decreased. Coincidental increases in mud flow rate and rate of penetration (ROP) had also been found. The greater ROP was attributed to better cleaning beneath the bit due to higher mud flow rates. It is not known why the mud flow rate increased. REECo has proposed that a Measurement While Drilling (MWD) System be acquired to research the dual string reverse air lift fluid system used to drill the large diameter holes at the NTS. A better understanding of the fluid system should lead to better control and eventually more consistent and lower cost drilling. A Hewlett Packard based MWD is being assembled.

Research Organization:
Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (USA)
DOE Contract Number:
AC08-84NV10327
OSTI ID:
5596551
Report Number(s):
CONF-8605124-1; ON: DE86010449
Country of Publication:
United States
Language:
English

Similar Records

Design, testing, and evaluation of an air injection grouting system for geothermal bores. Final report
Technical Report · Tue Mar 31 23:00:00 EST 1998 · OSTI ID:362349

Drilling operations change gear
Journal Article · Sun Aug 01 00:00:00 EDT 1982 · Pet. Eng. Int.; (United States) · OSTI ID:6031313

Low invasion corehead reduces mud invasion while improving performances
Journal Article · Wed Nov 30 23:00:00 EST 1994 · Journal of Energy Resources Technology; (United States) · OSTI ID:6603179