Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

10 MWe Solar Thermal Central Receiver Pilot Plant remote operation feasibility study

Technical Report ·
DOI:https://doi.org/10.2172/5582152· OSTI ID:5582152
This report describes the results of a feasibility study for remote operation of the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, California. The plant, called Solar One, is a cooperative activity between the Department of Energy and the Associates: Southern California Edison, the Los Angeles Department of Water and Power, and the California Energy Commission. This report provides a description of the changes required to the plant and a rough cost estimate for the changes.
Research Organization:
McDonnell Douglas Astronautics Co., Huntington Beach, CA (USA)
DOE Contract Number:
AC04-76DR00789
OSTI ID:
5582152
Report Number(s):
SAND86-8186; ON: DE88005562
Country of Publication:
United States
Language:
English