Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

In-service inspection of steam turbine blades without disassembly

Conference · · Trans. Am. Nucl. Soc.; (United States)
OSTI ID:5579556

Loss of utility plant availability as a result of failure-causing cracks in steam turbine blades makes early detection of this problem critical. An Electric Power Research Institute survey, conducted as part of project RP 1266-24, indicated that 72% of turbine blade failures in fossil power plants occur in low-pressure (LP) turbines with half of all blade failures occurring in the last two blade stages (L-0 and L-1 rows). Failures are generally associated with blade tailing edges and root areas. Project RP 1266-24 also found that 79% of the blade problems in LP turbines were cracks. A turbine design of particular concern has been the Westinghouse Building Block (B.B.) 73. Reinhart and Associates has successfully inspected seven in-place B.B. 73 units for six utilities during the past 3 yr, as well as several disassembled turbines of other manufacturers and designs. These examinations consisted of visual and eddy-current examinations of the blade roots and trailing edges. The in-place inspections were performed using prototype manipulation devices to gain access to the blades through the hand holes. The only disassembly required to gain access for the examinations was the removal of the man-way covers on the main shell and the hand-hole covers on the outer cylinder covering the L-0 and L-1 blade rows.

OSTI ID:
5579556
Report Number(s):
CONF-870837-
Journal Information:
Trans. Am. Nucl. Soc.; (United States), Journal Name: Trans. Am. Nucl. Soc.; (United States) Vol. 54; ISSN TANSA
Country of Publication:
United States
Language:
English