Solar project cost report for Telex Communications, Inc. Assembly Plant, Blue Earth, Minnesota

Technical Report ·
OSTI ID:5578815
Detailed cost information is reported for the solar space heating project at the Telex Assembly Plant in Blue Earth, Minnesota. The system utilizes 360 ITC, flat plate liquid collectors having a net aperture area of 10,700 square feet. The collectors are mounted in 10 rows on ground level and are located across a parking lot from the plant building. The system provides space heating to the entire building. Solar energy is stored in a 20,000 gallon steel water tank which is located above grade inside the plant. Electric heaters provide the auxiliary energy. The construction costs of this solar space heating system are presented. Category costs are listed for Telex, general contractor's materials, general contractor's labor, and subcontract costs. The subcontract costs include materials, labor, and overhead and profit for the insulation, controls, and electrical power subystems. The construction cost for this project was $374,170 not including general contractor overhead and profit and general and administrative costs. (MHR)
Research Organization:
Mueller Associates, Inc., Baltimore, MD (USA)
OSTI ID:
5578815
Report Number(s):
SOLAR/2033-79/60
Country of Publication:
United States
Language:
English