skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cool-Water Coal Gasification Program: Environmental Monitoring Plan Commissioning Phase, final report. Volume 1. Technical report. Volume 2. Appendix A - HRSG (heat recovery steam generator) stack-testing results. Volume 3. Appendix B - analytical results. Appendix C - sampling analytical methods. Appendix D - ambient air monitoring data. Volume 4. Appendix E - quality assurance/quality control. Technical report

Technical Report ·
OSTI ID:5575083

The Cool Water Coal Gasification Program (CWCGP) began electrical production under the terms of the Price Guarantee Commitment with the U.S. Synthetic Fuels Corporation (SFC) on June 24, 1984. An Environmental Monitoring Plan (EMP) approved by the SFC was initiated at that time. The Commissioning Phase, the first of four phases of the EMP, was conducted from June 24 through December 31, 1984. Sampling and analysis of compliance and supplemental parameters produced over 1100 samples and 8500 data points from 17 aqueous, ten gaseous, and four solid sampling streams. The technical report includes a description of the CWCGP process as it was operated during the Commissioning Phase, a summary of process changes that occurred during the period, their effect on the environmental monitoring effort, and details of pollution-control testing (Appendix A), data calculations (Appendix B), analytical methods and results (Appendix C), ambient-air-monitoring data (Appendix D), and quality-assurance/quality-control program results (Appendix E).

Research Organization:
Cool Water Coal Gasification Program, Daggett, CA (USA)
OSTI ID:
5575083
Report Number(s):
PB-88-127592/XAB
Resource Relation:
Other Information: Also pub. as Radian Corp., Austin, TX. Rept. No. DCN-85-218-032-51; Portions of this document are not fully legible
Country of Publication:
United States
Language:
English