Title: The Atlantic Richfield Company Black Thunder mine haul road dust study. [Wyoming]

Journal Article · · Proc., Annu. Meet., Air Pollut. Control Assoc.; (United States)
OSTI ID:5574239

An examination of the effectiveness of various haul road dust control measures was performed at ARCO's Black Thunder Mine near Wright, Wyoming by evaluating both visible observations and quantitative measurements of particle concentrations. In order to evaluate dust control effectiveness both a 300 foot (91.5 meter) and 175 foot (53.4 meter) section of the main coal haul road was selected for testing. The test sections were separated by a 200 foot (61 meter) buffer zone. Each test section was relatively straight and away from interferences from other mine sources. The five haul road treatment test sequences evaluated for control measure effectiveness were: an untreated road segment; water treatment two times per hour; water treatment four times per hour; previously chemically treated segment of haul road (ARCO 2400 dust suppressant); and testing after application of Coherex (10% dilution). By comparing uncontrolled situations with various controlled situations, an estimate of the control efficiency of the dust control measures was determined. Based upon the results of the study a fugitive dust control scheme was selected considering control effectiveness, economics and operational efficiency.

Research Organization:
Anaconda Minerals Company, Denver, CO
OSTI ID:
5574239
Journal Information:
Proc., Annu. Meet., Air Pollut. Control Assoc.; (United States), Vol. 82-47.2
Country of Publication:
United States
Language:
English