Energy engineering analysis study report, Milan Army Ammunition Plant, Milan, Tennessee: Executive summary. Final report
This report is a summary of the Energy Engineering Analysis for the Milan Army Ammunition Plant (MAAP) in Milan, Tennessee. It includes the recommendations for the development of a Basewide Energy Plan consisting of energy conservation projects and other recommendations for reduction of the installation`s 1985 source energy consumption. Milan Army Ammunition Plant, containing 22,541 acres, is situated in both Gibson and Carroll Counties, Tennessee, and is approximately equally divided longitudinally into the two counties. The Milan area experiences typically short mild winters and long warm summers. With the exception of a few modernized facilities, the overwhelming majority of buildings at MAAP were constructed for World War II ammunition production.
- Research Organization:
- Day and Zimmerman, Inc., Parson, KS (United States)
- OSTI ID:
- 557359
- Report Number(s):
- AD-A-330210/6/XAB; CNN: Contract DACA01-80-C-0097; TRN: 73441102
- Resource Relation:
- Other Information: PBD: Sep 1982
- Country of Publication:
- United States
- Language:
- English
Similar Records
Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, TN. (First remedial action), September 1992. Interim report
Evaluation of various organic fertilizer substrates and hydraulic retention times for enhancing anaerobic degradation of explosives-contaminated groundwater while using constructed wetlands at the Milan Army Ammunition Plant, Milan, Tennessee. Final report