Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Initial operation of the new Bevatron local injector

Conference ·
OSTI ID:5572967
Initial operational characteristics of a new Bevatron injector system are described. It is capable of providing an independent source of ions to the Bevatron through mass 40. The new injector consists of a sputter ion PIG source, operating on a 60 kV dc platform, an RFQ linac, and two Alvarez linacs, all operating at 199 MHz. Beams with q/A greater than or equal to 0.14 are accelerated to 200 keV/n in the RFQ and to 800 keV/n in the first Alvarez tank. Each Alvarez operates in the 2..beta..lambda mode, and each is followed by a foil stripper. Beams with a q/A greater than or equal to 0.32 are accelerated through the second Alvarez to 5 MeV/n, fully stripped, and injected into the Bevatron. Because the Bevatron can be efficiently switched between this injector and the SuperHILAC injector, a more efficient operations schedule is made possible to meet the increasingly diverse needs of the Biomedical and Nuclear Science research programs. 5 refs.
Research Organization:
Lawrence Berkeley Lab., CA (USA)
DOE Contract Number:
AC03-76SF00098
OSTI ID:
5572967
Report Number(s):
LBL-18967; CONF-850504-230; ON: DE85015206
Country of Publication:
United States
Language:
English

Similar Records

Initial operation of the new bevatron local injector
Conference · Tue Oct 01 00:00:00 EDT 1985 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:6341285

Heavy ion upgrade of the Bevatron local injector
Conference · Tue May 01 00:00:00 EDT 1984 · OSTI ID:6678083

Improved Bevatron local injector ion source performance
Conference · Tue Oct 01 00:00:00 EDT 1985 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:6077504