SRC-II Demonstration Project. Phase zero, task number 1: deliverable number 2. Demonstration plant capital and operating cost

Technical Report ·
DOI:https://doi.org/10.2172/5563531· OSTI ID:5563531
This report contains the various cost estimates prepared by Stearns-Roger for the SRC-II 6700 tpsd Demonstration Plant at Morgantown, West Virginia, with descriptions of the methods used to prepare these estimates and the qualifications for them. The following estimates are included: direct capital costs, elements of indirect capital costs, and elements of annual operating costs. Each of these estimates is presented in November 1978 dollars and in December 1977 dollars. The design revisions described in Section 6 of Deliverable No. 1 Demonstration Plant Description, have been incorporated into all costs. These costs are part of the source information for cash flow projections and relative timing of Budget Authorizations which appear in Deliverable 12, Volumes 1 and 3. Appendix A to this report is a study made by Bechtel Incorporated to provide a third party confirmation of the preliminary capital cost estimate by Stearns-Roger for the design and construction of an SRC-II Demonstration Plant.
Research Organization:
Pittsburgh and Midway Coal Mining Co., Denver, CO (USA)
OSTI ID:
5563531
Report Number(s):
FE-3055-T5
Country of Publication:
United States
Language:
English