Analysis of the VENUS-1 ex-core neutron dosimetry using the LEPRICON code system
Book
·
OSTI ID:55601
- SCK/CEN, Mol (Belgium). Fuel Research Div.
- SKODA Concern, Plzen (Czech Republic). Nuclear Machinery Plant
The VENUS-1 Mock-up ex-core neutron dosimetry is analyzed by means of the LEPRICON code system using the ELXSIR 56-group cross section library. Two analyses are performed: the first one using the old iron cross-sections, the second using the new evaluation of the inelastic iron cross-sections present in the ELXSIR library. Results, when compared with those from earlier analysis show the clear improvement of the Calculation-to-Experiment (C/E) ratios. The decreasing radial trend in the C/E observed in the former analysis is drastically reduced due to the finer energy group structure of the ELXSIR library (56 instead of 17 groups). This trend is still improved by the use of the iron cross-section evaluation of FU. This leads to a flat radial C/E (around a value of 1.0) from the edge of the core until the neutron pad. The objectives of this new analysis are triple: (i) to quantify the improvement of the calculated detector responses when using the ELXSIR library, (ii) to display the consistency of the VENUS-1 ex-core dosimetry results with th intention of their integration in the LEPRICON Associated Benchmark Data Base, (iii) to show the drastic reduction of the standard deviation on the adjusted results leading to demonstrate that the LEPRICON methodology is adequate for the neutron surveillance dosimetry analysis.
- OSTI ID:
- 55601
- Report Number(s):
- CONF-930809--; ISBN 0-8031-1899-6
- Country of Publication:
- United States
- Language:
- English
Similar Records
Concrete benchmark experiment as support to ex-vessel LWR surveillance dosimetry
Using the LEPRICON System to Evaluate Best-Estimate Vessel Fluence at Ulchin NPP Unit 1
Validity of the linearity assumption in the LEPRICON adjustment module
Book
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:55608
Using the LEPRICON System to Evaluate Best-Estimate Vessel Fluence at Ulchin NPP Unit 1
Conference
·
Sun Jun 04 00:00:00 EDT 2000
·
OSTI ID:786226
Validity of the linearity assumption in the LEPRICON adjustment module
Journal Article
·
Sun Nov 30 23:00:00 EST 1997
· Transactions of the American Nuclear Society
·
OSTI ID:552567