A successful waste stream analysis on a large construction project in a radiologically controlled facility

Conference ·
OSTI ID:555404
 [1];  [2]; ;  [3]
  1. n,p Energy, Inc. (United States)
  2. SAIC, Inc. (United States)
  3. Los Alamos National Lab., NM (United States)

The Los Alamos National Laboratory (the Laboratory) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently under going a major, multi-year demolition and construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D and D) job and are identical to the requirements of any of several upgrades projects anticipated for the laboratory and other Department of Energy (DOE) sites. For these reasons the CMR upgrades Project is seen as an ideal model facility--to test the application and measure the success of waste minimization techniques which could be implemented for any similar projects. The purpose of this paper will be to discuss the successful completion of a waste stream analysis. The analyses performed was to measure the potential impact of waste generation, in terms of volume and costs, for a reconfiguration option being considered to change the approach and execution of the original project.

Research Organization:
Los Alamos National Lab., NM (United States)
Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
555404
Report Number(s):
LA-UR--97-3188; CONF-970854--; ON: DE98001340
Country of Publication:
United States
Language:
English